Briefing an architect or builder on hearing augmentation
What to include at design stage so it is not discovered during construction. Hand this to your design team before drawings are issued.
Print it, or fill it in here. Nothing you type is sent anywhere.

Critical — define these first
Nothing else can be scoped, quoted or compared until these are answered.

Conditional — define if these apply
Work through each trigger. If it applies to your site, the item becomes critical.
Optional — worth defining
Not required, but each one makes the next conversation shorter.
Traps to avoid in architect and builder briefings
Discovering an obligation after the quote has been accepted.
Treating hearing augmentation as an add-on rather than part of the design.
Treating accessibility as something to resolve after installation.
Overlooking reception counters, interview rooms, activity spaces and multipurpose rooms.
Treating compliance as a product purchase rather than a designed outcome.
What happens next
1Anything left blank in the critical section is a gap, not an oversight. It will surface later, usually during installation.
2Bring the completed sheet to a site review. It replaces about half the meeting.
3If a conditional trigger applies and you are unsure how to answer it, that is exactly what the review is for.
This checklist is general guidance. Requirements vary by project, jurisdiction, building classification and approval pathway.